Shelby County Dogwood Wastewater Treatment Plant

Project Scope

Dogwood Wastewater Treamtment Modification to meet EPA standards. ABES was selected as the prime consultant for this project.

Scope of Services

ABES Engineering is the prime consultant responsible for the following:

  • Review permit requirements, effluent testing data, flow data, and other information related to the Dogwood Campus plant operation to determine modifications required for the current system to meet current and expected permit requirements.
  • Evaluate the option of constructing a new sewer lift station and abandonment of the plant, including evaluation of the City of Memphis’ Chapel Hill subdivision treatment plant and plans for upgrade for possible exchange of ownership.
  • Based on County’s selection, design and submit construction plans to TDEC and work with them to get the plans approved.
  • Assist in the preparation of Request for Proposal documents and provide recommendations on submitted contractor proposals and review and approve submittal of the selected contractor anlyzing the alternatives to solve the Dogwood Wastewater Water Treatment Plant which is not meeting the EPA standards.

Project Elements:

  • Feasibility Study
  • Design
  • Project Management
  • Decommissioning
  • Construction Inspection